Preparing swimming pool “bond beam” for tile and coping installation.
Preparing swimming pool “bond beam”
for tile and coping installation.
Installing brick coping.
Installing brick coping.
Installing tile.
Installing tile.
Preparing swimming pool for application of new surface.
Preparing swimming pool for application
of new surface.
Applying the new finish (plaster or Pebble Tec©.)
Applying the new finish
(plaster or Pebble Tec©.)
Hand troweling new finish (plaster or pebble)
Hand troweling new finish (plaster or pebble)
Completing installation of new surface.
Completing installation of new surface.
Final washing of Pebble
Final washing of Pebble
Draining the swimming pool and beginning to remove old coping.
Draining the swimming pool and beginning to remove old coping.
Removing the old tile.
Removing the old tile.
Saw-cutting the deck to provide needed spacing from pool beam.
Saw-cutting the deck to provide needed spacing from pool beam.
Installing”bats” to level the pool, planning tile and coping installation.
Installing”bats” to level the pool, planning tile and coping installation.