Get your project started today!

FREE ESTIMATE

FREE ESTIMATE

800-675-0665

College of Marin Miwok Aquatic Center – Novato, CA (2021)

by | Aug 18, 2025

In 2021, Adams Pool Solutions played a key role in one of Northern California’s largest aquatic facility projects, the Miwok Center at the College of Marin’s Indian Valley Campus in Novato. This state-of-the-art facility was developed as part of a major Design-Build effort to support students’ academic health and wellness, kinesiology, aquatics, and athletics programs.

Project Overview

The Miwok Center is a 21,000-square-foot aquatic and fitness facility designed to serve both the college and the broader community. It includes:

  • A 50-meter Olympic-size competition pool
  • An adjacent six-lane, 25-yard warm-up pool
  • A 10-meter dive tower featuring a cast-in-place concrete core with precast dive platforms
  • A fitness center with cardio, weights, and group fitness spaces
  • Community areas for classes, team training, swim meets, camps, and recreational use

Adams Pool Solutions’ Role

As the finishing contractor, Adams Pool Solutions was selected to install the plaster finish on all three bodies of water in the new aquatic center. This included the Olympic pool, warm-up pool, and dive tower pool. The scale and technical requirements of the project demanded precision application to meet both performance standards and aesthetic expectations.

College of Marin - Replastering Swimming Pool by Adams Pool Solutions

Adams’ team drew on decades of expertise in large-scale commercial pool finishing to ensure durable, smooth, and competition-ready surfaces. With three different aquatic environments requiring uniform quality, coordination and scheduling were critical.

Replastering a commercial swimming pool in Marin

Outcome

The project was successfully completed in 2021, delivering one of the premier aquatic facilities in the Bay Area. Today, the Miwok Center stands as a hub for student athletics, community recreation, and competitive aquatics, with Adams Pool Solutions’ craftsmanship playing a vital role in its functionality and long-term performance.

Project Stats

Scope & Scale

  • Three major aquatic bodies completed in one project: Competition Pool, Warm-Up Pool, and Dive Pool
  • Combined pool perimeter of over 800 linear feet

Manpower & Resources

  • 60+ skilled plasterers and crew on-site
  • Three plaster rigs operating simultaneously for maximum efficiency

Technical Complexity

  • Competition pool with a 480′ perimeter and depths ranging 7’–7’6″
  • Warm-up pool with a 250′ perimeter and depths ranging 3’6″–5′
  • Dive pool spanning 75′ x 50′

Execution Excellence

  • Precision timing and coordination across multiple crews
  • Seamless delivery on a high-profile commercial project
  • Demonstrates capacity for large-scale, deadline-driven work

Results

  • High-performance plaster finish designed to withstand heavy athletic and recreational use
  • Project completed to meet demanding competition standards

We'd love to help you with your POOL PROJECT!