Process
Preparing swimming pool “bond beam” for tile and coping installation.
Preparing swimming pool “bond beam” for tile and coping installation.
Preparing swimming pool for application of new surface.
Preparing swimming pool for application of new surface.
Draining the swimming pool and beginning to remove old coping.
Draining the swimming pool and beginning to remove old coping.
Saw-cutting the deck to provide needed spacing from pool beam.
Saw-cutting the deck to provide needed spacing from pool beam.